Where Predictability Breaks Down in Controlled Spaces Tenant Improvement (TI) projects are often assumed to be the most predictable category of construction. The space already exists, the scope is defined early, and budgets are typically negotiated in advance. On the surface, this creates the impression of control. Yet TI projects consistently overrun budgets across markets and asset types. The cause is rarely dramatic. Instead, it is a gradual breakdown in alignment between